Florida’s First Commercial Net-Zero-Energy Building Is Generating More Energy Than It Consumes.

A few years ago in central Florida, John Santarpia had an idea. He was the president and CEO of a credit union and felt he needed to do something to improve its image. He and his colleagues had found a lot in Lakeland, a city of about 100,000 residents, with an ice cream shop on it. Knowing the community wouldn’t be in favor of losing the ice cream shop, Santarpia decided to build a flagship building for his credit union around it. Whatever it was, he wanted to make it green. What resulted was the state’s first commercial net-zero-energy building.

The difference is that Santarpia was interested in new technology and was attracted by the fact that there were no net-zero commercial buildings in Florida yet, Tim Hoeft, a sustainable engineer atStraughn Trout Architects, said. Santarpia wanted his to be the first.

Although it is still loosely defined, net-zero usually means a building that produces as much energy as is consumed. The Department of Energy‘s website lists eight net-zero-energy commercial buildings up and running in the country. Most are small and in mild-weather environments. But the DOE number could be misleading because it relies on owners to voluntarily submit their building’s information. At the New Buildings Institute, Technical Director Mark Frankel estimates the real number could be closer to 25, with about 50 more in construction.

Santarpia’s building is among those not listed by the DOE. Through the construction and rebranding process, the credit union’s name changed from Community First to Magnify, in part to reflect a new, green identity. The decision to make the building net-zero evolved on its own. First, Santarpia and his colleagues looked into certifying the building under the U.S. Green Building Council‘s Leadership in Energy and Environmental Design program. Once they figured out how to do that, they looked into putting solar panels on the roof.

During construction, Santarpia sought help from local design and construction professionals as well as the local utility company. They ended up with a rectangular-shaped building with just over 4,000 sq-ft of space, high ceilings and an upward-sloping roof. It opened in August 2009.

The building combines control systems with its “double roof” concept. Its top layer of solar panels shades it from direct heat gain. The space between the roof layers, along with its slope, helps the hot air convect, or rise and disperse, instead of raising the temperature in the building.

Solar panels on the roof generate energy, although the building still draws from the grid when it needs to. Other energy-saving mechanisms include using Energy Star-labeled appliances, using equipment to shade the inside from Florida’s hot sun and applying high-performance insulation to further reduce solar heat gain. A utility bill in October of last year confirmed the net-zero claim when it found that the building was generating more power than it was using. Forty-five percent of the energy produced in the panels goes back into the grid.

Net-zero has potential in a booming industry

In theory, at least, there is a big pot of money that entrepreneurs with net-zero ambitions can draw from. Each year, more than $600 billion is spent on new construction and renovation of commercial buildings, according to the Commercial Buildings Consortium (CBC). But adding the technology to commercial buildings — which use 40 percent of the country’s energy and make up 40 percent of its greenhouse gas emissions — is a challenge.

Last month, President Obama announced the Better Buildings Initiative, which sets a target to improve commercial buildings energy efficiency by 20 percent over the next decade.

Depending on how they’re defined, net-zero-energy buildings may take what Obama envisions one step further. Usually, net-zero refers to buildings that don’t use any more energy than they produce. Once the buildings are running, they must meet the energy rules set before construction to stay true to the net-zero claim.

Two reports released last month by the CBC detail ways for new buildings to achieve net-zero-energy status.

The CBC, an umbrella organization that includes more than 430 organizations representing commercial building interests, says no formal definition exists for net-zero. Both reports lay out a “directional goal” to get there. One focuses on technology barriers, while the other looks into market barriers like building codes and standards.

Jeffrey Harris, senior vice president for programs at the Alliance to Save Energy, says that the magnitude people are talking about for net-zero is an 80 percent reduction of energy consumption from today’s levels.

Their small, one-story size gives net-zero buildings plenty of daylight. Mild-weather environments allow them to ease use of air conditioning and heat. It’s also hard to put them in urban environments because shading from nearby buildings will affect natural lighting.

‘Keep building standards flexible’

One unintended consequence of building many of these with the available technology could lead to a groups of small, low-level buildings spread out in a sprawl. The CBC doesn’t want this to happen.

A way to avoid this would be to be flexible about standards. A new 30-story building may need 10 times as much energy as a three-story building, Harris said, but it could still produce as much energy on a square-foot basis. That 30-story building may not be self-sufficient, but it would still save energy.

Harris identifies three immediate areas to help achieve net-zero: integrated design, efficient control systems and lifetime performance assurances. In other words, a building’s design process must include input from designers at all levels. Its control systems must work together, and it needs a system to monitor its performance.

Harris describes integrated design as “making sure the new building’s team brings in energy efficiency teams to take account of how changes in one system can affect another.”

Diana Lin, a program manager with the National Association of State Energy Officials, said the process could include lighting designers, engineers, contractors and other “downstream actors.”

“Oftentimes, a building owner comes in with an idea and an architect designs it” and it stays at that, Lin said. What could result is an inability to understand how a building’s many different systems work together. Bringing all levels of designers in at an early stage would give them a chance to provide input. It would also help developers understand how a building’s different systems interact, Lin said.

The Magnify building, which used a lot of the same building processes later laid out by the CBC reports, is an ambitious venture for a credit union. The investment in it won’t pay for itself for maybe 15 years. Santarpia said all the press coverage and attention has led to new customers. But most mid-sized credit unions can’t afford to wait that long for money to come back.

Source: The New York Times– Edited by Amanda McLeman, Consulting-Specifying Engineerwww.csemag.com

The National Association of Home Builders (NAHB) recently completed a survey study to determine how new homes will shape up over the next several years. The study, presented annually at the NAHB International Builders’ Show, surveyed builders on consumer preferences and revealed that Americans have changed their views of what they would like to see in their next home.

68 percent of builder surveyed suggest that homes will include more green products, features, and technology such as low-E windows; engineered wood beams, joists or tresses; water-efficient features like dual-flush toilets and low-flow faucets; and EnergyStar rating for the whole house by 2015.

Additionally, the study predicts that home sizes will decrease. To save on square footage, homeowners are eliminating spaces like living rooms, foyers, and dining rooms. However, about 54 percent of builders reported that family room size is likely to increase by 2015, according to the NAHB’s assistant vice president for survey research, Rose Quint.

You can learn more about the housing trends that are expected to be present by 2015 on the NAHB website, or you can check out the full study at Housingeconomics.com.

Photo credit: Nahb.org.

For most people, the construction method is never questioned.  Stick Frame and truss roof are assumed.  Why is this? – because that’s what builders offer.   There really is no other reason.  The building method is so ingrained in our sensibilities that even when we design and build our own homes, we still build with sticks.  There are many better options, but still, we build with sticks.

Stick frame has some benefits

  • Most construction trade people understand the system, no new learning or tools are needed.
  • Re-tooling is not necessary
  • Architects understand the system and can accomplish many difficult designs using stick frame and trusses.
  • Last minute changes during the construction cycle are relatively easy.
  • The system does not need to be explained to anyone.
  • Building Inspectors know what needs to be done and how to inspect it.

Stick frame also has some significant drawbacks

  • It is nearly impossible to insulate stick frame properly
  • There is insufficient trained trade labor to properly build with stick frame
  • It is extremely complicated as a structural system, with too many trades involved- too easy to miss the mark.
  • Moisture infiltration into the wall, roof, and ceiling systems almost assure mold and mildew problems.
  • The guys at the end (plumbers, electricians, HVAC guys) have a tendency to cut up the structure dangerously.
  • Structural material quality has eroded substantially over the past ten years.
  • It’s very easy to downgrade the specification without the owner’s knowledge.
  • It’s a thirty year system.
  • Cathedral ceilings are weaker, poorly insulated, and slow to build.Use beyond thirty years results in substandard housing.

In Addition, there are a number of excellent options

  • Structural Insulated Panels (SIPs) exceed specification for stick frame in every respect (strength, insulation, tolerance) and can be used for walls, roof, ceiling, and roof.   They are pre-cut to fit on site and greatly reduce on site labor hours and skill levels necessary.  A 100 to 150 year system.
  • Steel frame is quicker and stronger.
  • Engineered lumber floor trusses are faster
  • Insulating Concrete Form (ICF) wall systems are stronger, better insulated, have good thermal mass, are quicker to build
  • Aerated concrete blocks are strong, have good thermal mass, and are quick to build with.
  • Cast in Place concrete is strong, has good thermal mass, and is a 150 year structure.

Steel framing has insulation disadvantages, as does cast in place concrete.  The aerated concrete blocks are very limited in their usability.  The best combination of these systems is ICF walls, with engineered lumber floor trusses, and SIPs for the roof or ceiling system. If the budget is tight or the land is not flat, SIPs also make excellent walls.

The Real Cost of Stick Framing

Do not let builders railroad you with inferior building systems.  It will cost you- in many ways.  If you settle for stick frame, it will cost you in the following ways:

  • Poor constructionA short life span- under forty years
  • Over budget and not on schedule
  • Horribly insulated
  • Weak, especially in high winds or snow load

reprinted from http://www.sipsproducts.com/stick/

Your new home is designed and now it’s time to hire a builder. Before you do, the architect gives you some guidance and tells you that there are two types of contracts that govern construction. One type is called the Fixed Price Contract. The other, the Cost Plus contract.

Fixed Price Contract

The Fixed Price Contract is just what the name implies: the builder agrees to build the house for a fixed price. In order for a Fixed Price Contract to make sense, the builder and the owner must have an clear and similar vision of what the project entails. For example, the level of finishes must be understood as standards will be cost sensitive. The builder will base his price on a very detailed budget and other assumptions then will add a profit margin unknown to the owner. The danger of the Fixed Price Contract is that what the builder assumes may not match what the client is envisioning. This may not become apparent until well after construction has begun. For example, a builder might specify a certain type of shower fixtures throughout the house. When the contract is signed, the owner assumes the amount budgeted (or allowed) for fixtures will be adequate but later, when actually choosing the specific fixtures, determines that the allowed amount is not satisfactory. Many design elements are priced as allowances. In other words, the builder gives an allowance for a specific item knowing that the owner does not, at the time of the contract signing, know exactly which brand and style might be selected. As illustrated, many assumptions, allowances and expectations must mesh perfectly for both the builder and the client to be well satisfied. A Fixed Price Contract can work well if the project is sufficiently simple so that all involved have a clear picture of what the finished project will be. But in the case of higher-end custom homes, a clear idea of the finished project is quite difficult. The design aspects of the house can be exceedingly complicated. If a fixed price contract is governing this type of project, the owner, architect, and builder can come into conflict over expectations and ultimately, money. And the builder may use “change orders” to exceed the amount of the fixed price if the owner’s desires and expectations exceed the builder’s allowances and assumptions.

Cost Plus Contract

The Cost Plus Contract is a contract based on a estimated cost that is not fixed. The builder proposes an approximate budget, and agrees to take profit based on a percentage of the total cost of labor and materials. With the cost plus contract, the owner is given the actual cost of each expenditure and is aware at all times exactly what the builder has spent for labor and materials.During construction, the owner must approve all expenditures. As a result, the owner is very involved in the economics of the project and in fact, is called upon to supervise how and where money is spent. This type of contract allows for project flexibility. For example, if the amount budgeted for excavation is lower than expected, that amount can be, if the owner wishes, transferred to the amount budgeted for, as an example, plumbing fixtures. Though the Cost Plus project depends on an accurate estimate of costs just as does the Fixed Price project, the Cost Plus contract and process allows for greater transparency than the Fixed Price Contract. Of course, the Cost Plus Contract requires that the owner be willing to spend time participating in the supervision of the budget. Costs can escalate if the owner does not make efforts to control spending. The Cost Plus Contract is ideally suited to more complex projects where there is a great emphasis on design, standards, and finishes and quality is of utmost concern.

The Bottom Line

The home owner must make take very seriously the contract phase of the home building project. In the past, the Fixed Price Contract was often the instrument of choice. As custom homes become increasingly more complicated and thus difficult to budget with exact precision, the Cost Plus Contract provides flexibility and transparency that the Fixed Price Contract cannot. The Cost Plus Contract has become the contract of choice for complex custom home projects.

Timber Frame Construction, compared to stick built or conventional framing, is a very sustainable building technology. Unlike stick building, the materials used in a timber frame will inevitably be reclaimed and recycled. In fact, many timber frames are made from reclaimed and recycled frames from barns, bridges, warehouses, and factory buildings. An argument is sometimes made that Timber Frames use old growth lumber. In fact, some do. But Timber Frame homes typically last much longer than conventionally framed homes. Timber Frames in Europe and Asia are more than 1000 years old. One way to preserve old growth forests is to build homes that last a lot longer so fewer trees will be cut for construction purposes. One other fact about Timber Frames is that they are frequently build from fast growing farm raised southern yellow pine which is kiln dried. Farm raised Southern Yellow pine is a renewable resource.

Further supporting Timber Frame as a sustainable building method is that Timber Frame combined with SIP panels provides a highly insulated, tight structure that uses much less energy for heating and cooling than conventionally framed structures.

A Timber Frame home, though generally more expensive to build than a conventionally framed home, also brings with it the beauty of posts and beams, open floor plans and soaring ceilings. So Timber Frame construction is not only good for the planet, but beautiful as well.

Trilogy Partners is on Facebook and we would love for you to join us there! Our Facebook page is a great place to connect with us, keep up with our projects and the latest in sustainable building practices, design tips and trends, and much more. We always post links to our blog posts on our Facebook page so you’ll never miss out on what’s going on. There you can find other useful information, such as our contact information and photos of our work.

If you haven’t joined Trilogy Partners on Facebook yet, head on over to facebook.com/TrilogyPartners and click the like button at the top of our page to add us to your profile. While you’re there, do us a favor and suggest our page to all of your friends. Also, be sure to like The Haitian Orphan Rescue Program, which is a charity co-founded by Trilogy Partner Michael Rath that builds permanent shelter for orphaned and abandoned Haitian children.

We hope to connect with you on Facebook soon!

Connect with Trilogy Partners on Facebook!

So much of what we build today is junk. And by junk I mean, it’s not going to be around in 100 years. In a short 100 years that new house you see going up in the new ticky-tack subdivision across the road is going to be bulldozed flat to make room for more junk. Because they just don’t build things the way they used to… with an eye to the future and concerns for the longevity of the structure. And pretty much every piece and parcel of today’s brand new subdivision home is going to end up in a landfill. Because hardly any of it is recyclable.

The Dimensional Lumber Trap

I know it was supposed to be a big deal when dimensional lumber became the primary structural ingredient of smaller buildings. It was supposed to revolutionize the construction of single family and smaller multi-family dwellings. The 2x4s and their ilk make up most of the structural components of todays subdivision clones. Oh, there are some heavier structural components, but a home is only as strong structurally as its weakest link, and most of these homes are shoddily framed with small dimensional lumber. That’s the cheapest way to do it and as much as we claim to be concerned about sustainability, we’re all about affordable housing now. And think of this: what if a home did last for 20 generations instead of 5? If that were the case, then we would need a lot fewer homes each year because fewer homes would need to be replaced. And that’s not a good thing for all those people who work in the second largest industry in the U.S. Farming is the first. Construction is the second. Junk food and junk houses.

Building Things That Last For Centuries

So there you have it. Construction has many thousands of years of history and we are now building cheap, non-recyclable or reclaimable housing instead of housing that could indeed, last centuries. 1000 years ago in Asia and Europe they were building buildings that are still around today. They are made of stone and timbers carefully chosen for longevity, insect resistance, for their ability to perform through the centuries, to withstand hurricanes, earthquakes, and man’s occupancy. Certainly we have the resources to build like that today. And in some cases we are. Timber Frame structures and buildings constructed of larger manufactured structural members are built to last. They are the aberration, not the norm. Look around you. How many of the newer structures you see will still be standing in more than 100 years much less 1000? We don’t build it to last. We build it so it will be relatively easy to demolish. If the Roman Coliseum were built today it certainly wouldn’t last more than about 40 years. Don’t you think? Despite all we’ve learned about building since the time of the Egyptians and the Mayans and the Romans and all the great forefathers of modern construction, we don’t build any better. Rather, we build worse. We don’t build for tomorrow. We build for now. And now is a very temporary thing.

That’s why I say, all the world’s best builders are dead.

People will see one of my projects for the first time and well, I get this question a lot. “Where did you get your ideas?” they’ll ask. The simple answer is that first, I got inspired. And then, from somewhere, ideas started to fly in. But first comes inspiration. And it always happens. With every project. Because it has to if I’m to do my job and design the best house I know how.

Inspiration. I cannot over exaggerate the importance of inspiration as part of the creative process. Because inspiration brings passion. Integrity and honesty. Originality. And utility to every project. And long after I’m gone, inspiration stays behind to greet the homeowner, their family, and their guests ever time they enter the house. Or wake up in the morning. Inspiration is forever.

As to how the inspiration comes, the process usually goes something like this: I start thinking about the client. I ponder their… well their humanity, as strange as that may sound.  What is this house going to mean to them. Usually the house is a dream… something they’ve been wanting their entire lives. It’s an ambition that has survived through time, through years. Often this house represents sacrifice and certainly a measure of success. I’ll even ask the client, “what does this house mean to you?” Usually, it means a whole lot. Enough, on occasion, to make eyes well with tears. There is a story behind every house because there is a story behind the people who want to build it and each story is uniquely, beautifully human. It is from that seed of humanity that I feel the need, and a commitment, to help my client achieve their goals.  I feel inspired as my clients’ dreams become mine. And from that inspiration comes a passion that infuses the process with energy and originality.

Design Rendering of Trilogy Design Build Project "Calecho"

Trilogy is a Design Build residential construction company. But just what is Design Build?

What It Isn’t

Let me answer that question by first giving and example of what Design Build is not. Suppose you want to build your dream home (or any home, for that matter.) What’s the first thing you do? Right, buy a lot. So you contact a real estate agent who helps you find a lot. Now you own a lot. It may be , in industry parlance, a highly build-able lot. Or it may require expensive infrastructure that you weren’t counting on. You’ll find that out later on. Okay, still you own the lot. Now you need someone to design a house for the lot. Taking a deep breath you initiate an interview process and then hire an architect. An engineer. And you may or may not need other specialists or someone to help with planning, building permits and all the other details necessary before you can even begin to build. Then you need to hire a builder. You audition a bunch of builders. You may ask for a bid from each one. The bid is based on a budget based on the drawings the architect and engineer have produced. Some of the bids are low, some high. Some of the builders say the plans are adequate for construction. Others say the plans are inadequate and they  need more information, something the architect disputes. So you lay awake at night. Which builder do you hire? One builder says your lot will be difficult to build on. Another says it’s a piece of cake. Do you hire the lowest bid? What if a builder with a fantastic reputation comes in at a higher price. Is he worth the extra money? And then a couple of the builders say they don’t like fixed price budgets and that their clients prefer Cost Plus contracts and budgets. What are they talking about? The one thing you know for sure. Every builder, the architect, the engineer, the interior designer, everyone associated with the project seems to have a different opinion about every question you ask.

This is not Design Build. Design Build proposes a completely different organizational structure.

What It Is

With Design Build the client engages one entity to oversee the entirety of the home building project to include but not limited to lot choice, planning, architectural design and interior design. The Design Builder puts together an experienced team and facilitates the interaction between the design and build project participants. Architecture, Engineering, Planning, Construction, Interior Design, Interior Decorating integrate seamlessly around the table provided by the Design Builder. Most Design Builders will even suggest that they take a roll in helping the client and the real estate professional secure the best lot. The Design Builder is the party responsible for the successful outcome of the project.  The Design Builder is the bottom line when it comes to cost or labor or timeline. The Design Builder helps the home owner establish a responsible budget amount, and then governs the process so that the owner reaches budgetary goals. And architectural goals. And goals that include time frame and completion dates. A good Design Builder even advises the client with issues concerning project impact and sustainability. The Design Builder is the owner’s partner in the design and construction of the home. The Design builder supplies all the manpower, materials, and know how needed to build the home. Design Build not only offers the client a degree of integration, fiduciary responsibility, and efficiency that is atypical of the conventional “design then engineer then build” construction process. But Design build offers the homeowner client an unmatched level of security, commitment and accountability as well.

Trilogy Partner’s Design and Build approach results in successful projects. Its strong and enduring client relationships proves the worth of Design Build as a management process. Visit the Project Gallery to see examples of Trilogy Design Build projects.

Boiler Room with Geothermal Heat Exchange System

From earlier writings we described the environmental commitment of Breckenridge homeowner Kyle M. to build an 8,000 sq. ft. luxury zero energy home. We continue today with the inside story of this net zero home. This writing focuses on the renewable energy systems chosen including solar electric and geo-exchange, along with an integrated lighting and electronics program that dually functions as an energy management system. Once Ambient Energy produced the energy modeling for the 8,000 sq. ft. home, the engineering and building team went to work to choose materials that would conserve as much energy as possible. Step one: Design and build a tight well-insulated energy-efficient home. Step two: Incorporate renewable energy and smart-home control systems geared to energy conservation.

The environmental heating and cooling solutions for the Breckenridge Timber Trail home demonstrate a high degree of integration among experienced professionals not unlike the workings of a well trained sports team. This team’s goal: design and install an efficient geo exchange heating ventilation and cooling (HVAC) system to provide 100 percent of the home’s space heating needs with a natural gas boiler backing up system. First up to bat was Barry Engleman of George T. Sanders Companyof Silverthorne. George T. Sanders did the heat calculations for the home to determine how much radiant floor tubing was needed to keep the house warming properly even down to 20 degrees below zero. Engleman designed the layout and Tekmar control systems that control the radiant floor hydronic system. Next to bat was Eric Atcheson of E.W.A. Mechanical Inc. based in Silverthorne. E.W.A worked closely with Engleman, and was responsible for the home’s plumbing, heating, and automated Tekmar control systems. Following Engleman’s layout and his own expertise, Atcheson installed the plumbing system for domestic hot water production, radiant floor heat tubes to supply heating for the home, and the optional snowmelt system for the driveway. The house received two high efficiency boilers that integrate with the ground source heat pumps and ensure the home’s comfort on the coldest of Breckenridge nights. Our third and fourth batters were Jim Dexter from Summit Professionals of Silverthorne and Bob Major of Major Heating and Cooling in Wheat Ridge. The two companies managed the installation and integration of the ground source geo exchange heating and cooling system, heat pumps, air handling and humidification. Summit Professionals designed systems and duct work to provide a fresh supply of air to the home and comfortable environment. Dexter installed an integrated air handling, humidification and Energy Recovery Ventilator which gives the homeowner complete control over the indoor environment. The Breckenridge home receives 100 percent of its space heating and summer cooling from a geothermal heat pump system. Geo exchange uses the constant 50 to 55 degree temperature of the earth to warm the home when it is cold outside and to cool the home on hot days. Before excavation of the home, the geo exchange wells were drilled. Major Heating and Geothermal in conjunction with Can-America Drilling Inc., installs a closed loop system consisting of 19 boreholes, each 300 ft deep, around the foundation and under the driveway.

Solar PV System

Photovoltaic Panels

SolSource, Inc., a solar engineering and installation firm based in Denver, was engaged to design and install the solar photovoltaic system, through their partnership with Breckenridge-based Colorado Building Company.

The Making of Breckenridge’s First Custom Net Zero Home

Dave Lyskawa, Sol-Source VP of Residential Sales, met the homeowner’s goal of designing a solar electric system that provides 100 percent of the home’s electrical needs. For phase one, SolSource installed a 9.89 kW solar PV array. The solar energy installation consists of 43 SolarWorld 230-watt panels with black frames. SolarWorld modules are 100 percent manufactured in the U.S. The solar panels are connected to Enphase micro inverters and an Enphase energy management unit which provides 24/7 system monitoring. Enphase increased the energy production of the solar array by maximizing the energy generated by each individual solar panel. SolSource also selected Enphase to allow for system expandability and is pre-wiring the home for an additional 7 kW system in phase two. The energy produced by the 9.89 kW array prevents an estimated 29,907 pounds of C02 from entering the atmosphere every year.

Lighting and Energy Management Systems

A final component to creating Breckenridge’s first custom net zero home was integrated lighting, energy management, and whole house automation system. Players were Chad Ballard of Paradigm Systems, Inc. based in Denver using the Vantage Control system and Daniel Stern with Electronics by Design in Broomfield. All lighting fixtures installed were evaluated for functionality and energy efficiency. “We focus on correct color, intensity, dimming and usage of the lights required in a luxury residence, while ensuring that the house is performing at the minimum energy consumption,” said Ballard. The Vantage system was chosen for its ability to provide automated and remote control of the home’s lights, HVAC, shades, fans, audio/ video and home theater distribution systems, security through sensors, timers, keypads and energy consumption meters. Lights in high use rooms were programmed with occupancy sensors that turn on when some one enters the room at a set intensity and turn off when motion is no longer detected after a set time interval. This simple house-wide lighting/motion sensor system enables the homeowner to masterfully manage the home’s electricity usage and significantly conserve energy. This Breckenridge residence is likely the “smartest home” in town. If homeowner Kyle wants to, he can press a button on his cell phone as he is driving up to his mountain chateau and engage a “Welcome” mode. With one button the lights turn on, the blinds go up, the garage door opens, and music begins to play.

965 N Ten Mile Dr. , Unit A1 Frisco, CO 80443
Phone: 970-453-2230

Email: information at trilogybuilds dot com
Facebook: TrilogyPartners
Twitter: @trilogybuilds
Instagram: trilogybuilds
Youtube: The Trilogy Partners Channel
Houzz: trilogy-partners